D Minus 1 Production Scenario: Production Model for Produced Hospital Furniture
Many kinds of production systems are used in medical equipment industries, one of which is through the work-in-process (WIP) buffer control system and feeding material scenarios to assure ability of the process to produce the expected throughput. The production model, known as the D minus 1 producti...
Saved in:
| Main Author: | |
|---|---|
| Format: | Book Chapter |
| Language: | English |
| Published: |
IntechOpen
2020
|
| Subjects: | |
| Online Access: | https://www.intechopen.com/chapters/73361 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items: D Minus 1 Production Scenario: Production Model for Produced Hospital Furniture
- Production of Activated Char and Producer Gas Sewage Sludge
- Application of Hagedoorn’s Plus-Minus Method to Hydrology Study
- Potential Production of Biofuel from Microalgae Biomass Produced in Wastewater
- Microbial Biodiesel Production - Oil Feedstocks Produced from Microbial Cell Cultivations
- The Creation of Furniture Products from Rice Stubble
- Introductory Chapter: Synthesis Gas Production – History and Current Scenario