Bore Pile Foundation Construction without Caused Fine Cracks at Three Heritage Building
Bore pile foundation close heritage building should be no damage. Install the bore pile process had to perfect, nonporous concrete, no necking, no sliding soil, no mixed deep water, Objective the construction of bore pile near heritage buildings did not deformation and no crack. The case study metho...
Guardado en:
| Autor principal: | |
|---|---|
| Formato: | Capítulo de libro |
| Lenguaje: | inglés |
| Publicado: |
IntechOpen
2021
|
| Materias: | |
| Acceso en línea: | https://www.intechopen.com/chapters/77480 |
| Etiquetas: |
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares: Bore Pile Foundation Construction without Caused Fine Cracks at Three Heritage Building
- Reliability Analysis of Bored-pile Wall Stability Considering Parameter Uncertainties
- Development of a support vector machine-based predictive model for bored pile productivity in residential construction projects in Iraq
- Response of piled buildings to the construction of deep excavations /
- Transformer-Based Deep Learning Model for Bored Pile Load-Deformation Prediction in Bangkok Subsoil
- A boring story about work: Do bored employees ruminate?
- Bores|Mallarmé: inspiración superpuesta