Polynomial Algorithm for Constructing Pareto-Optimal Schedules for Problem 1∣<em>r</em><sub>j</sub>∣<em>L</em><sub>max</sub>,<em>C</em><sub>max</sub>
In this chapter, we consider the single machine scheduling problem with given release dates, processing times, and due dates with two objective functions. The first one is to minimize the maximum lateness, that is, maximum difference between each job due date and its actual completion time. The seco...
Guardado en:
| Autores principales: | , |
|---|---|
| Formato: | Capítulo de libro |
| Lenguaje: | inglés |
| Publicado: |
IntechOpen
2020
|
| Materias: | |
| Acceso en línea: | https://www.intechopen.com/chapters/73530 |
| Etiquetas: |
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares: Polynomial Algorithm for Constructing Pareto-Optimal Schedules for Problem 1∣<em>r</em><sub>j</sub>∣<em>L</em><sub>max</sub>,<em>C</em><sub>max</sub>
- <em>β</em><sub><em>I</em></sub>-Compactness, <em>β</em><sub><em>I</em></sub>*-Hyperconnectedness and <em>β</em><sub><em>I</em></sub>-Separatedness in Ideal Topological Spaces
- Analytical Expressions of Infinite Fourier Sine and Cosine Transform-Based Ramanujan Integrals <em>R</em><sub><em>S,C</em></sub>(<em>m, n</em>) in Terms of Hypergeometric Series <sub>2</sub><em>F</em><sub>3</sub>(⋅)
- A Layered Recurrent Neural Network for Imputing Air Pollutants Missing Data and Prediction of <em>NO</em><sub>2</sub>, <em>O</em><sub>3</sub>, <em>PM</em><sub>10</sub>, and <em>PM</em><sub>2.5</sub>
- Elliptic Curve over a Local Finite Ring <em>R<sub>n</sub></em>
- Crystal Structure of [C<sub>17</sub>H<sub>22</sub>N<sub>2</sub>]<sub>3</sub>[P<sub>6</sub>O<sub>18</sub>][H<sub>2</sub>O]<sub>8</sub>
- Thermodynamic Stability and Microscopic Behavior of Ba<sub>x</sub>Sr<sub>1-x</sub>Co<sub>1-y</sub>Fe<sub>y</sub>O<sub>3-δ</sub> Perovskites